Our team at Milton Keynes concrete bases install concrete bases around the available access, existing ground and the building going on top.
We regularly carry out concrete base work across established residential areas around Leighton Buzzard. Many of the properties are semi-detached suburban homes where older garden layouts, existing slabs and restricted side access can affect how the job needs to be organised.
A lot of the properties we work around Leighton Buzzard are established family homes with gardens that have changed over the years. Old paving, partial concrete bases, garden walls and different levels can all affect where a new base can go and how the ground needs to be prepared.
Before starting, we look at the proposed position of the base, what is already underneath the area and how materials will reach the garden. The base needs to suit both the ground available and the building that will sit on it.
Where an existing slab or old base is in the way, this is dealt with as part of the preparation rather than building over unsuitable ground. Getting the preparation right at this stage helps avoid problems such as movement or sinking later on.
Discuss Your Concrete BaseThe finished base needs to work with the building that is going onto it. That means considering the footprint, position and surrounding garden before the concrete is ordered and the pour is arranged.
We set out the proposed area, deal with the existing ground and prepare the base beneath the concrete according to the requirements of the job. Where reinforcement is appropriate, this is included as part of the installation rather than treated as an afterthought.
The aim is straightforward: prepare the ground properly and produce the concrete base the project actually requires.
Most problems with a concrete base are difficult to correct once the building has been installed. If the ground underneath has not been prepared properly, movement or sinking can affect everything above it.
That is why we do not rush the preparation stage. Existing slabs, unsuitable material and changes in ground level are dealt with before the concrete is placed. The access route is also considered from the start so the installation does not become unnecessarily complicated once work begins.
We keep the installation straightforward and organise the work around the actual property rather than assuming every garden can be approached in the same way.
We discuss the intended building and look at the proposed base position. Steps, fences, raised sections, narrow routes and existing garden surfaces are considered before excavation begins.
The base area is marked out and the existing surface and unsuitable material are removed as required. Where an old slab or partial base is present, its condition is considered before the new preparation is carried out.
A suitable MOT Type 1 sub-base is installed and compacted where required to prepare the ground beneath the concrete. The amount of preparation depends on the existing ground and the requirements of the project.
Formwork is set to the required dimensions and reinforcement is positioned where the project calls for it.
Fresh concrete is placed, levelled and finished to provide the surface required for the intended building. The installation is checked before the work is completed.
If you are planning a new outdoor building and need a concrete base installed in Leighton Buzzard, get in touch with the dimensions, proposed position and any details you already have about the site.
If the garden has old slabs, an existing partial base, steps, fences or a raised section between the property and the work area, mention this when you enquire. We can discuss how the access and preparation need to be approached.
From setting out and excavation through to the finished concrete, the installation is planned around the property and the requirements of the project.